Construction of 5. Lock Chamber, Brunsbüttel
Project consulting:
In September 2017, INPROCON was commissioned to support the construction works of the 5th lock chamber of the “Nord-Ostsee-Kanal” (North Sea/Baltic Sea Canal) near Brunsbüttel with a Technical Manager for the solid construction.
The services of INPROCON comprise, amongst others: management of supplier’s and subcontractor’s services, site mobilization planning, equipment planning, support with award of contracts to suppliers and subcontractors, progress reporting, cost controlling, cost optimization etc.
Project:
The big (new) lock chamber in Brunsbüttel was opened for traffic in 1914. After more than 100 years of operation, a general rehabilitation of the solid construction, of the hydraulic steel structures as well as of the mechanical and electrotechnical facilities was urgently necessary for maintenance of transport and operating safety. To prevent disruption of vessel traffic during the period of rehabilitation, a 5th lock chamber is required. The length of this chamber is approx. 360 m, its width is approx. 45 m. The chamber will be suitable to accommodate ships up to a maximum width of approx. 44 m and a maximum draught up to 11 m.
Client:
Wayss & Freytag Ingenieurbau AG
Contract value:
€ 400 Mio